Skip to main content
Licensed electrician installing a Level 2 EV charger at a Greater Toronto Area home

Serving Toronto and surrounding areas

EV Charger Installation in Toronto and Across the GTA

We install Level 2 EV chargers, upgrade 100A panels to 200A, and handle ESA permits across the City of Toronto, from The Beaches to High Park. Same-day quote, next-day install for standard scope.

Response

Same-day quote, next-day install

Track Record

400+ installs across Toronto

Utility

Toronto Hydro

Rating

4.9 / 5 (150+ Google reviews)

Licensing

ESA/ECRA Licensed

Response

Same-day quote, next-day install

Completed

1,200+ installs

Services

What do we install?

We install Level 2 EV chargers, upgrade 100A panels to 200A, and handle ESA permits across the City of Toronto, from The Beaches to High Park. Same-day quote, next-day install for standard scope.

How fast can you get to my Toronto address?

Our crews work the old City of Toronto every day, running the DVP, Gardiner, Allen Road, and the Lake Shore corridor. For most downtown, midtown, and east end addresses we quote the same day you call and install the next day when the scope is standard Level 2 with no service upgrade.

Jobs inside the core need a bit more planning. Permit parking on streets like Palmerston and Sorauren, laneway garage access in Riverdale and Leslieville, and Toronto Hydro service coordination all add lead time, so we book those with a window rather than a drop-in slot. If your job needs a Toronto Hydro disconnect and reconnect, plan on 1 to 2 weeks from approved quote to energized charger.

What Toronto homes and buildings do you work in?

Toronto's housing stock is the widest in the GTA. Century semis in The Annex and Riverdale often still run 60A or 100A service with legacy fuse panels, so a load calculation to OESC Section 8 comes first and a panel upgrade or a DCC-9 load management device usually follows. Post-war bungalows around High Park and The Beaches are typically 100A with room for a subpanel.

We also work in condo and townhouse parking across the downtown core, where the Ontario Condominium Act Section 98 process, submetering, and shared-circuit load management decide the design. New infill builds and laneway suites are usually 200A and EV-ready, which means a clean 2 to 4 hour Tesla Wall Connector or Grizzl-E install.

Neighbourhoods we cover in Toronto

Downtown Midtown Uptown East End West End The Beaches Riverdale The Annex High Park Leslieville

Why Us

Why Toronto homeowners call us

  • ESA/ECRA licensed with a Master Electrician (309A) on staff
  • Toronto Hydro service upgrade coordination handled end to end
  • Fixed written quote with the ESA permit fee itemized
  • Home Renovation Savings rebate filed on your behalf, up to $5,000
  • Load management alternatives quoted before you pay for a panel upgrade

Our Process

How does the install actually work?

Four steps from your first call to a Certificate of Acceptance in your hand. No surprises in between.

01

Free Quote by Phone

Tell us your vehicle, your panel, and where you park. We call you back within 2 hours and give you a price range on the spot.

02

Site Inspection and Load Calculation

Our crew checks your service size, panel space, and routing, then runs an OESC Section 8 load calculation to confirm what your home can carry.

03

Written Fixed-Price Quote

You get a fixed written quote with the ESA permit fee itemized. No hidden fees, and no work starts until you approve it.

04

Install Day and ESA Inspection

We install, book the ESA inspection, hand over the Certificate of Acceptance, and file your rebate paperwork on your behalf.

Ready to Charge at Home?

Same-day quote, next-day install for standard Level 2 scope. We call you back within 2 hours.

Reviews

What Toronto customers say

4.9 out of 5 across 150+ Google reviews from Toronto and GTA homeowners.

"We needed chargers approved through our condo board under Section 98. The team handled the documentation, submetering, and insurance coordination. Our board finally signed off."

David L.

Downtown Toronto

"Century home, 100A fuse panel, laneway garage. They ran the load calculation, upgraded us to 200A, and trenched the garage circuit. ESA Certificate came through without a hitch."

Janelle P.

Riverdale

"Quoted at 11am, installed the next morning. The Grizzl-E is hardwired and clean, and they filed the rebate paperwork for me."

Marc T.

The Beaches

Local FAQ

EV charger questions from Toronto

What does a Level 2 install cost in an older Annex or Riverdale home?

A standard Level 2 install runs $1,500 to $2,800 CAD when your panel has spare capacity. With a 100A to 200A panel upgrade, budget $4,000 to $7,300 CAD combined. Older homes in The Annex or Riverdale that need a service mast and meter base sit at the higher end.

Do I need an ESA permit to install an EV charger in Toronto?

Yes. Every EV charger installation in Toronto requires an Electrical Safety Authority permit and inspection. We file the permit, book the inspection, and give you the Certificate of Acceptance, which your insurer and any future buyer will ask for.

Can I add a Level 2 charger to a 100A panel in an older Toronto home?

Often yes. Many 100A Toronto homes qualify for a DCC-9 or DCC-12 load management device under OESC Rule 8-106, which sheds the EV load when the house peaks. We run the load calculation first and only recommend a panel upgrade when the numbers require it.

How does Toronto Hydro coordination work for a service upgrade?

If your job needs more than a panel swap, we file with Toronto Hydro for the disconnect and reconnect, coordinate the point of attachment and meter base work, and schedule the ESA inspection around the utility date. That process typically takes 1 to 2 weeks.

Which Toronto neighbourhoods do you cover?

All of the old City of Toronto, including Downtown, Midtown, Uptown, the East End, the West End, The Beaches, Riverdale, The Annex, High Park, and Leslieville, plus North York, East York, Scarborough, and Etobicoke.

Can you install in a laneway garage or detached garage?

Yes. Detached and laneway garages need a buried feeder or an existing sub-feed, plus a subpanel in many cases. We scope trenching, conduit, and feeder sizing during the site inspection so the quote you sign is the price you pay.

Still have a question about your panel or your charger?

Ask Our Crew

Coverage

Our Toronto service area

Nearby

We also install near Toronto

Our crews cover the whole GTA grid. Pick the area closest to you for local detail.

Electric vehicle charging from a wall-mounted Level 2 charger in a Toronto garage

2026 Ontario EV Rebate: up to $5,000 for eligible installations

Need an EV charger installed in Toronto?

Same-day quote, next-day install. ESA permit, inspection, and Certificate of Acceptance included on every install.

  • ESA permit and inspection included
  • Fixed written pricing, no hidden fees
  • Rebates filed on your behalf
Call Now Free Quote