Skip to main content
Licensed electrician installing a Level 2 EV charger at a Greater Toronto Area home

Serving Pickering and surrounding areas

EV Charger Installation in Pickering and Across the GTA

Level 2 installs and Tesla Wall Connectors across Rougemount, Amberlea, Bay Ridges, Duffin Heights, and Seaton.

Response

Same-day quote, next-day install

Track Record

85+ installs across Pickering

Utility

Elexicon Energy

Rating

4.9 / 5 (150+ Google reviews)

Licensing

ESA/ECRA Licensed

Response

Same-day quote, next-day install

Completed

1,200+ installs

Services

What do we install?

Level 2 installs and Tesla Wall Connectors across Rougemount, Amberlea, Bay Ridges, Duffin Heights, and Seaton.

How fast can you get to Pickering?

Highway 401 and Brock Road connect Pickering to our Scarborough route, so standard Level 2 scope is quoted the same day and installed the next.

Elexicon Energy serves the Durham grid. Service upgrades are filed with Elexicon, and we schedule the ESA inspection around the utility date, which normally means 1 to 2 weeks.

What Pickering homes do you work in?

The new Seaton and Duffin Heights communities are built EV-ready, with 200A panels and in many cases a rough-in already run to the garage. Those installs are fast, tidy, and rarely need any panel work.

Older Bay Ridges and Amberlea homes are more mixed, with some on 100A service. There a load calculation decides between an upgrade, a subpanel, or a DCC-9 load management device.

Neighbourhoods we cover in Pickering

Rougemount Amberlea Bay Ridges Duffin Heights Seaton

Why Us

Why Pickering trusts our crew

  • Fast installs in EV-ready Seaton and Duffin Heights builds
  • Elexicon Energy service coordination when required
  • Tesla Wall Connector and multi-brand Level 2 installs
  • Fixed written quote with the ESA permit fee itemized
  • WSIB insured, $2M general liability, bonded

Our Process

How does the install actually work?

Four steps from your first call to a Certificate of Acceptance in your hand. No surprises in between.

01

Free Quote by Phone

Tell us your vehicle, your panel, and where you park. We call you back within 2 hours and give you a price range on the spot.

02

Site Inspection and Load Calculation

Our crew checks your service size, panel space, and routing, then runs an OESC Section 8 load calculation to confirm what your home can carry.

03

Written Fixed-Price Quote

You get a fixed written quote with the ESA permit fee itemized. No hidden fees, and no work starts until you approve it.

04

Install Day and ESA Inspection

We install, book the ESA inspection, hand over the Certificate of Acceptance, and file your rebate paperwork on your behalf.

Ready to Charge at Home?

Same-day quote, next-day install for standard Level 2 scope. We call you back within 2 hours.

Reviews

What Pickering customers say

4.9 out of 5 across 150+ Google reviews from Toronto and GTA homeowners.

"Builder left a rough-in, they finished it properly and commissioned the charger the same visit."

Dan K.

Seaton

"100A service. They talked me through load management honestly instead of pushing an upgrade."

Aisha R.

Amberlea

"Tidy hardwired install, ESA passed, and the rebate paperwork was filed for me."

Paul H.

Bay Ridges

Local FAQ

EV charger questions from Pickering

How much does EV charger installation cost in Pickering?

Standard Level 2 installs run $1,500 to $2,800 CAD. Seaton and Duffin Heights builds with a rough-in often come in at the low end. Panel upgrades add $2,500 to $4,500 CAD.

Are Seaton homes EV-ready?

Most are. New Seaton and Duffin Heights builds usually have 200A service and a conduit rough-in to the garage, which makes the install quick.

Which utility serves Pickering?

Elexicon Energy. We file any service upgrade application with them and coordinate the ESA inspection around the utility date.

Which Pickering areas do you serve?

Rougemount, Amberlea, Bay Ridges, Duffin Heights, and Seaton, plus Ajax and Scarborough.

How long does the install take in Pickering?

Standard scope is a same-day quote and next-day install, with 2 to 4 hours on site plus the ESA inspection. Service upgrades take 1 to 2 weeks.

Still have a question about your panel or your charger?

Ask Our Crew

Coverage

Our Pickering service area

Nearby

We also install near Pickering

Our crews cover the whole GTA grid. Pick the area closest to you for local detail.

Electric vehicle charging from a wall-mounted Level 2 charger in a Toronto garage

2026 Ontario EV Rebate: up to $5,000 for eligible installations

Need an EV charger installed in Pickering?

Same-day quote, next-day install. ESA permit, inspection, and Certificate of Acceptance included on every install.

  • ESA permit and inspection included
  • Fixed written pricing, no hidden fees
  • Rebates filed on your behalf
Call Now Free Quote