About Us
The GTA's Dedicated EV Charging and Panel Upgrade Crew
We install Level 2 EV chargers and upgrade electrical panels across Toronto and the Greater Toronto Area. That is the whole business. No lighting retrofits, no general handyman work, just charging infrastructure done to the Ontario Electrical Safety Code.
Rating
4.9 / 5 (150+ Google reviews)
Licensing
ESA/ECRA Licensed
Response
Same-day quote, next-day install
Completed
1,200+ installs
Our Story
Why we only do EV charging
Ontario's EV adoption moved faster than its housing stock. Most homes across the GTA were wired long before anyone parked a 48A load in the driveway, and the gap between "I bought an EV" and "my panel can carry it" is where a lot of homeowners get stuck, oversold, or quoted three wildly different numbers in a week.
Our crew built the business around closing that gap properly. We run an OESC Section 8 load calculation on every job, quote the cheapest compliant path, and file the ESA permit so the work is documented for your insurer and for whoever buys your house later. Over 10 years and more than 1,200 installs, that approach has been the whole marketing plan.
We work with Tesla Wall Connector and Universal Wall Connector, ChargePoint Home Flex, Grizzl-E Classic and Avalanche, JuiceBox, Wallbox Pulsar Plus, Emporia, Sun Country Highway, and FLO. We coordinate service upgrades with Toronto Hydro, Alectra Utilities, Elexicon Energy, and the local utilities in Oakville, Burlington, Milton, and Newmarket.
Our Team
Meet the crew
Every job is led by an ESA/ECRA licensed Electrical Contractor with a Master Electrician (309A) on staff.
Best EV Charger Toronto Crew
ESA/ECRA Licensed Electrical Contractor
Our crew is the dedicated EV charger and electrical panel upgrade team at Best EV Charger Installation Toronto, serving Toronto and the Greater Toronto Area. Every install is led by an ESA/ECRA licensed Electrical Contractor with a Master Electrician (309A) on staff, WSIB coverage, and $2M general liability insurance.
How We Work
Four rules we do not bend
We quote the cheapest compliant option first
If a $700 load management device does the job, we will not sell you a $4,000 panel upgrade. The load calculation decides, and we show you the numbers.
Fixed written pricing, always
You get a written quote with the ESA permit fee itemized before we touch anything. No day-of change orders, no vague allowances, no hidden fees.
Warranty language you can trust
We register the manufacturer parts warranty on your behalf, typically 3 to 5 years depending on brand. We do not invent our own warranty claims to close a sale.
Compliance is not optional
Every install is done to the current Ontario Electrical Safety Code, with an ESA permit, an inspection, and a Certificate of Acceptance handed to you at the end.
Our Process
How does the install actually work?
Four steps from your first call to a Certificate of Acceptance in your hand. No surprises in between.
01
Free Quote by Phone
Tell us your vehicle, your panel, and where you park. We call you back within 2 hours and give you a price range on the spot.
02
Site Inspection and Load Calculation
Our crew checks your service size, panel space, and routing, then runs an OESC Section 8 load calculation to confirm what your home can carry.
03
Written Fixed-Price Quote
You get a fixed written quote with the ESA permit fee itemized. No hidden fees, and no work starts until you approve it.
04
Install Day and ESA Inspection
We install, book the ESA inspection, hand over the Certificate of Acceptance, and file your rebate paperwork on your behalf.
10+
Years installing in the GTA
1,200+
Chargers and panels completed
4.9
Star Google rating
2 hr
Quote callback promise
Want a straight answer on your panel?
We will tell you what your service can carry and what it will cost, before you commit to anything.
Reviews
What GTA customers say
4.9 out of 5 across 150+ Google reviews from Toronto and GTA homeowners.
"Same-day quote, next-day install. The crew ran a full load calculation, filed the ESA permit, and had my Tesla Wall Connector charging by the following afternoon. Fixed price, no surprises."
Michael R.
North York
"My 100A panel was full, so I assumed I needed a $4,000 upgrade. They installed a DCC-9 load management device instead and I charge overnight with no issues. Saved me thousands."
Priya S.
Mississauga
"We needed chargers approved through our condo board under Section 98. The team handled the documentation, submetering, and insurance coordination. Our board finally signed off."
David L.
Downtown Toronto
2026 Ontario EV Rebate: up to $5,000 for eligible installations
Ready to charge at home?
Send us your address and vehicle and we will call you back within 2 hours with a price range. Fixed written quote before any work begins.
- ESA permit and inspection included
- Fixed written pricing, no hidden fees
- Rebates filed on your behalf