# Subpanel Installation for EV Charging in Toronto and the GTA

Last updated: September 7, 2026

A dedicated subpanel for the EV charger circuit when the main panel is out of breaker space but service capacity is fine.

$1,500 to $2,800 CAD

Same-day quote, next-day install

Get Your Free Quote

[/contact/ →](/contact/)

 

Call (647) 577-6133

[tel:+16475776133 →](tel:+16475776133)

-   ESA/ECRA Licensed
-   |
-   Master Electrician on Staff
-   |
-   $2M Liability
-   |
-   WSIB Insured

Rating

4.9 / 5 (150+ Google reviews)

Licensing

ESA/ECRA Licensed

Response

Same-day quote, next-day install

Completed

1,200+ installs

## What is a subpanel, and when do you need one?

If your main panel has spare service capacity but no breaker space, a dedicated subpanel is often the right, lower-cost fix. Our crew sizes the feeder, runs a load calculation, and installs the subpanel so your EV circuit has a clean home without a full panel upgrade. We file the ESA permit and schedule the inspection so everything is compliant.

A subpanel is a smaller distribution panel fed from your main panel by a single dedicated feeder. It provides new breaker spaces without touching your service size, your meter, or the utility. For a home that simply ran out of slots after years of added circuits, that is exactly the problem to solve.

The confusion that costs people money is treating “full panel” and “not enough service” as the same thing. They are not, and only a load calculation tells them apart.

## Breaker space or service capacity?

This is the entire decision, and it is worth understanding before anyone quotes you.

**Service capacity** is how many amps your home can draw in total, set by your service size, meter, and main breaker. Typically 100A or 200A in the GTA. **Breaker space** is how many physical slots the panel has left. They are completely independent, and a panel can be physically full while the service still has substantial headroom.

If the load calculation shows spare capacity and the only obstacle is slots, a subpanel at $1,500 to $2,800 CAD gives you the EV circuit and room for the next few projects. If the calculation shows the service itself is near its limit, a subpanel does not help, and the honest answers are an 

EV load management device

[/load-management-system/ →](/load-management-system/)

 at $500 to $1,200 CAD or a 

200A electrical panel upgrade

[/electrical-panel-upgrade/ →](/electrical-panel-upgrade/)

 at $2,500 to $4,500 CAD.

We run the OESC Section 8 calculation before quoting so that decision is made on numbers rather than on how crowded the panel door looks.

### Common problems we solve

-   **Full panel, quoted a full upgrade** when a subpanel was the correct and cheaper fix.
-   **Tandem and double-stuffed breakers** used to squeeze in circuits, often beyond what the panel is listed for.
-   **Detached garages** with no power at all, or with a single lighting circuit borrowed from the house.
-   **Failed inspections** from subpanels wired with bonded neutrals, a classic and easily avoided error.
-   **Workshops and basement suites** that need their own distribution alongside the EV circuit.

## What does the install involve?

The subpanel is mounted, usually beside the main panel or at the load it serves. A feeder runs between them, sized from the load calculation with voltage drop checked on longer runs, protected by an appropriately rated breaker in the main panel.

Inside the subpanel, the neutral bar is isolated and the ground is separately bonded. That detail is not optional and it is the first thing an ESA inspector looks for. Your EV charger circuit is then landed on a double pole breaker, and the circuit directory is labelled properly inside the door.

For a detached garage, the same logic applies with a buried feeder in conduit, proper depth and backfill, and outdoor-rated terminations at both ends. We measure the run and price the trenching during the site inspection so nothing shifts on the day.

Then the ESA inspection, the Certificate of Acceptance, and a live charge session to confirm the circuit performs under real load.

## What does it cost across the GTA?

A subpanel beside the main panel runs $1,500 to $1,900 CAD. A remote subpanel with a feeder run across the house runs $1,900 to $2,800 CAD. A detached garage subpanel with buried feeder and trenching runs $2,800 to $4,200 CAD depending on distance and ground conditions.

All of those include the load calculation, the ESA permit, the inspection, and the Certificate of Acceptance. None of them require utility scheduling, which is why a subpanel job typically completes in a single day rather than the 1 to 2 weeks a 

full 200A service upgrade

[/200-amp-service-upgrade/ →](/200-amp-service-upgrade/)

 takes.

We size the subpanel with spare spaces on purpose. A second charger, a heat pump circuit, or workshop power later should be a breaker, not another project.

Transparent Pricing

## How much does subpanel install cost in Toronto?

$1,500 to $2,800 CAD (CAD). You get a fixed written quote with the ESA permit fee itemized before any work begins.

### Adjacent Subpanel

$1,500 to $1,900

-   Subpanel beside the main panel
-   Short feeder run
-   OESC Section 8 load calculation
-   ESA permit and inspection

Get Your Free Quote

[/contact/ →](/contact/)

Most Common

### Remote Subpanel

$1,900 to $2,800

-   Feeder run across the house
-   EV circuit landed and labelled
-   Spare capacity for future circuits
-   Charger commissioning included

Get Your Free Quote

[/contact/ →](/contact/)

### Detached Garage

$2,800 to $4,200

-   Buried feeder in conduit
-   Trenching and backfill
-   Garage subpanel and grounding
-   Outdoor-rated terminations

Get Your Free Quote

[/contact/ →](/contact/)

Range covers the subpanel, feeder, breakers, load calculation, ESA permit, and inspection. Detached garage subpanels with buried feeders and trenching sit at the top of the range or above, depending on run length.

Why Us

## Why choose us for subpanel install?

### We tell you when this is the cheaper answer

A full panel with spare service capacity is a subpanel job. Quoting an upgrade instead is the most common overcharge we see.

### Feeder sized for the real load

Sized to the load calculation with voltage drop checked, not to whatever conductor was on the van.

### Neutral and ground separated properly

A subpanel needs isolated neutral and bonded ground. Getting that wrong is a classic failed inspection.

### Spare spaces left deliberately

We size the subpanel with room for the next circuit, whether that is a second charger, a heat pump, or a workshop.

### Detached garages handled

Buried feeder, conduit, trenching, and a garage subpanel scoped and priced before we break ground.

### Upgrade path preserved

If you later need a full 200A service, the subpanel and its circuits carry over rather than being ripped out.

Process

## How does subpanel install work?

Four clear steps, with the ESA permit and inspection built into every one of them.

01

### Capacity vs Space Check

We establish whether your problem is spare amperage or spare breaker slots. Those are different problems with very different prices.

02

### Feeder Sizing

The load calculation sets the subpanel size and feeder conductors, with voltage drop checked on longer runs.

03

### Install and Land

Subpanel mounted, feeder run and terminated, neutral and ground properly separated, EV circuit landed and labelled.

04

### Inspect and Certify

ESA inspection booked, Certificate of Acceptance handed over, charger commissioned and tested under load.

Comparison

## How Best EV Charger Toronto compares

| Feature | Typical provider | Best EV Charger Toronto |
| --- | --- | --- |
| Diagnosis of the real limit | Panel looks full, upgrade quoted | Capacity vs breaker space established first |
| Typical cost | $2,500 to $4,500 panel upgrade | $1,500 to $2,800 subpanel where it fits |
| Feeder sizing | Minimum that passes | Sized with voltage drop calculated |
| Spare capacity | Exactly one free space | Room for future circuits by design |
| Utility involvement | Required for a service upgrade | None needed, so no utility wait |

Our Work

## Recent subpanel install jobs

Click any photo to enlarge.

 

## Need subpanel install in the GTA?

Send us your address and vehicle. We call back within 2 hours with a price range and a next available install date.

(647) 577-6133

[tel:+16475776133 →](tel:+16475776133)

 

Get Your Free Quote

[/contact/ →](/contact/)

Reviews

## What customers say about our subpanel install

4.9 out of 5 across 150+ Google reviews from Toronto and GTA homeowners.

> "Old bungalow, full panel. Instead of pushing a $4,000 upgrade they installed a subpanel and got the charger in for far less."

Ron D.

Don Mills, North York

> "Older home, full panel. Subpanel install instead of a full upgrade, priced fairly and finished in a day."

Stefan M.

Woodbridge, Vaughan

> "Detached garage at the back of the lot. They trenched the feeder, installed a subpanel, and the charger has run flawlessly through two winters."

Peter V.

The Kingsway, Etobicoke

FAQ

## Subpanel Install questions, answered

How much does a subpanel installation cost in Toronto?

A subpanel for an EV circuit runs $1,500 to $2,800 CAD, covering the panel, feeder, breakers, load calculation, ESA permit, and inspection. Detached garage subpanels with buried feeders and trenching run $2,800 to $4,200 CAD depending on the distance.

When is a subpanel better than a panel upgrade?

When your service has spare amperage but the main panel has no free breaker spaces. That is a very common situation in GTA homes that have had circuits added over the years. A subpanel solves it for roughly half the cost of a 100A to 200A upgrade, and there is no utility scheduling involved.

How do I know if I have capacity but no space?

The OESC Section 8 load calculation tells us. It totals your connected load, applies the code demand factors, and compares the result against your service size. If the number comes in comfortably below your service rating and the panel is simply physically full, a subpanel is the answer.

Does a subpanel need its own ESA permit?

Yes. Installing a subpanel and its feeder is permitted work in Ontario. We file the permit, book the inspection, and hand over the Certificate of Acceptance. That documentation also supports your Home Renovation Savings rebate claim.

Can a subpanel go in a detached garage?

Yes, and it is often the right approach. A buried feeder in conduit runs from the house to a subpanel in the garage, which then supplies the EV charger and any other garage circuits. We size the feeder for voltage drop over the distance and price the trenching upfront.

How long does a subpanel install take?

Most are a single day. Detached garage installs with trenching can run to two days depending on the ground conditions and the length of the run. There is no utility disconnect involved, so there is none of the 1 to 2 week wait a service upgrade brings.

Will a subpanel limit me later?

No, provided it is sized properly. We deliberately leave spare breaker spaces so you can add a second charger, a heat pump circuit, or workshop power later. And if you eventually need a full 200A service, the subpanel and everything on it carries straight over.

Is a subpanel as safe as a panel upgrade?

Yes, when installed correctly and within the load calculation. The important detail is that a subpanel requires an isolated neutral bar and a separately bonded ground, unlike a main panel. Getting that wrong is a common failed inspection, and it is one of the things the ESA inspector checks first.

Still have a question about your panel or your charger?

Ask Our Crew

[/contact/ →](/contact/)

Keep Reading

## Related services

### Electrical Panel Upgrade

100A to 200A residential service upgrades that give your home the capacity to charge an EV, with ESA permit filing and Toronto Hydro coordination.

View service →

[Electrical Panel Upgrade →](/electrical-panel-upgrade/)

### Load Management System (EVEMS) Installation

Smart load management (EVEMS) that lets a capacity-constrained panel power an EV charger without a full upgrade, compliant with OESC Rule 8-106.

View service →

[Load Management System (EVEMS) Installation →](/load-management-system/)

### 200 Amp Service Upgrade

A complete residential service upgrade including mast and meter base replacement where required, with Toronto Hydro coordination.

View service →

[200 Amp Service Upgrade →](/200-amp-service-upgrade/)

![Electric vehicle charging from a wall-mounted Level 2 charger in a Toronto garage](/images/hero/electric-vehicle-plugged-into-a-wall-mounted-level.webp)

2026 Ontario EV Rebate: up to $5,000 for eligible installations

## Book your subpanel install today

A dedicated subpanel for the EV charger circuit when the main panel is out of breaker space but service capacity is fine. Fixed written quote, ESA permit included, rebates filed on your behalf.

Get Your Free Quote

[/contact/ →](/contact/)

 

Call (647) 577-6133

[tel:+16475776133 →](tel:+16475776133)

-   ESA permit and inspection included
-   Fixed written pricing, no hidden fees
-   Rebates filed on your behalf